The Planning Investment Project with Identical Independent Jobs ?

semanticscholar(2018)

引用 0|浏览0
暂无评分
摘要
In the article, the investment project scheduling problem with identical technologically independent jobs is considered. The processing time of any job is a unit. A use of credit is allowed. In research of structure of the optimal solution, the continuous approximation of a problem is used. The result can then be presented in analytical view. Also, in the article, the algorithm of the solution of a problem in discrete case is offered.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要